Bubble defects
Glass production: quality, energy and delivery.
Watch production, choose a priority, then compare and apply the optimiser’s recommendation.
Line runningLine 1 · 500 ml bottles
12,480 / 30,000 accepted10:20
Target finish12:20
Production monitor
Live readings vary slightly as operating conditions change.
Gob temperature1,200.0 °C
Mould temperature500.0 °C
Glass cooling rate46.0 °C/sGlass temperature fall per second
Production rate190.0 items/minBottles formed each minute
Furnace & material readings
Furnace 1,550.0 °CBatch moisture 0.20%
Current bubble defects: 1.9%Running at the selected settings
Expected results with your targets
For the remaining productionEnergy per 1,000 accepted
Expected finish
Keep bubble defects below 3%
Follow production and the next 12 minutes.
Solid: production so far · Dashed: forecast
Optimisation recommendations
Choose a priority. Find a recommendation to compare quality, energy and finish time.
Fine-tune priorities
Recommended settingsWithin operating limits
Recommended parameter changes
The optimiser will keep adjusting as conditions change.
Optimiser assisting
Small adjustments keep the line close to your priorities.
Adjust process settingsOptional: explore the effect of a change
Parameter adjustments
Your controlSet targets here. Watch the production monitor respond.
Temperature of glass entering the mould.
1,140 °C1,240 °C
Surface temperature of the forming mould.
440 °C560 °C
Glass temperature fall per second during forming.
20 °C/s80 °C/s
Furnace & material conditions
Conditions reaching this line. The line optimiser leaves these unchanged.
1,500 °C1,600 °C
Water as a percentage of raw-material mass.
0.10%0.50%
The line responds gradually to changes.