Glass production: quality, energy and delivery.

Operating conditions affect defects, energy use and the time needed to finish this batch.

Line runningLine 1 · 500 ml bottles
12,480 / 30,000 accepted10:20
Target finish12:20

Parameter adjustments

Your control

Set targets here. Watch the production monitor respond.

1,200 °C

Temperature of glass entering the mould.

1,140 °C1,240 °C
500 °C

Surface temperature of the forming mould.

440 °C560 °C
46 °C/s

Glass temperature fall per second during forming.

20 °C/s80 °C/s
Furnace & material conditions

Conditions reaching this line. The line optimiser leaves these unchanged.

1,550 °C
1,500 °C1,600 °C
0.20 %

Water as a percentage of raw-material mass.

0.10%0.50%

The line responds gradually to changes.

Optimisation recommendations

Choose what matters most, then compare the recommended targets.

Production priority
Fine-tune priorities

Production monitor

Live readings vary slightly as operating conditions change.

Quality within target
Glass flows into a mould, cools and moves to quality inspection. Glass enters the mould1,200.0 °C Form & coolMould 500.0 °C Quality check190 items/min Glass enters mouldForm & coolQuality check 1,200.0 °C500.0 °C190.0 /min
Gob temperature1,200.0 °C
Mould temperature500.0 °C
Glass cooling rate46.0 °C/sGlass temperature fall per second
Production rate190.0 items/minBottles formed each minute
Furnace 1,550.0 °CBatch moisture 0.20%
Current bubble defects: 1.9%Running at the selected settings

Expected results with your targets

For the remaining production
Bubble defects

Energy per 1,000 accepted

Expected finish

Keep bubble defects below 3%

Follow production and the next 12 minutes.

Bubble defects (%)
Solid: production so far · Dashed: forecast